Initial dig out and foundation stone

Initial dig out and foundation stone

Here we have a Garden Office Concrete Base being laid for a log cabin to be  installed.
Working  from hom,e can have its distractions, this client decided to move into the office by installing a Garden Office Concrete Base with a log cabin on top.

The Houseman was engaged to install the Garden Office Concrete Base.  This job to a non-professional can look like a pretty daunting task. Here at The Houseman we like to take away any unnecessary stress and worry caused by major or even minor problems within your property.

At the property shown in the pictures above, the client had asked for a Garden Office Concrete Base to be  laid down in their back garden in order for a log cabin to be installed, and of course after receiving a quote they found The Houseman to be the best choice of company for them!
After only 4 days our team of skilled, professionals had finished the Garden Office Concrete Base to the high standard expected of them, leaving us with a very pleased client!
During those 4 days our workmen removed a large tree stump from the garden creating more space, dug out an area of 10ft x 5ft for the base of the cabin, laid a layer of single stone to stabilize the ground, they then fitted a DPC sheet and laid a 100ml deep layer of shed base concrete for the Garden Office Concrete Base.
As you can see from the pictures the job was completed neatly and to the clients hopes and expectations! As are all jobs completed by staff here at The Houseman!